VERO BEACH — Drives will notice a brand new bridge spanning the South Relief Canal and more travel lanes on US 1 between Oslo Road and Indian River Boulevard by the summer of 2010. PROJECT: US 1 from south of Oslo Road to south of Indian River BoulevardDESCRIPTION: This 1.7-mile-long project will include widening US 1 from four to six lanes. Other improvements include replacing the bridge over the South Relief Canal with a six-lane bridge, drainage, improvements, sidewalks, street lights and landscaping. CLOSURES: NoneSTART DATE: June 4, 2008COMPLETION DATE: Summer 2010
South Relief Canal bridge to be replaced, US 1 widened between Oslo and Indian River Blvd.
previous post