PROJECT: US 1 from 20th Place to 33rd Street in Vero BeachDESCRIPTION: Work will include repaving this 1.4-mile-long section, replacing traffic signals, adding sidewalks in some areas and repair sidewalks, landscaping in a traffic island near 20th Place and installing an overhead sign structure on US 1 northbound at 8th Avenue.CLOSURES: A lane will be closed periodically in each direction at 20th Place and at 33rd Street weekdays from 9 a.m. to 4 p.m.START DATE: April 6, 2009ESTIMATED COMPLETION: November, 2009