PROJECT: Wabasso Road (S.R. 510) between U.S. 1 and S.R. A1A in the Sebastian-Wabasso areaDESCRIPTION: Wabasso Road improvements in this 2-mile long construction zone will include repaving and adding a sidewalk alongside the road and on the bridges.CLOSURES: NoneSTART DATE: Sept. 2 2008ESTIMATED COMPLETION: September 2009